Skip to main content
alttext

Glossary| Resources

    • Themes
    • About US
    • Vision
    • Mission
    • Organization
    • Partnership
    • Resources
PRESS
  • Diagnosing and planning
  • Stakeholders and communication
  • Possible solutions
Home > Latest updates

Latest updates

  • Restoration of the surface flows of two temporary tributaries of the upstream Clauge
    06 December 2019
  • Restoring the natural dynamics of the upper Adour
    06 December 2019
  • Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze
    06 December 2019
  • Widening and sediment reloading of the Drac riverbed in Saint-Bonneten- Champsaur
    06 December 2019
  • Restoration of side channels of the Loire and its tributaries
    06 December 2019
  • Elimination of a dike blocking a Petersbach tributary
    06 December 2019
  • Removal of five lakes on the Val des Choues stream
    06 December 2019
  • Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes
    06 December 2019
  • Removal of the Maisons-Rouges dam over the River Vienne
    06 December 2019
  • Restoration of the river continuity on the Touques Basin
    06 December 2019

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next ›
  • last »
  • RSS  
  • Legal notice | 
  • Contact  
  • Back to top